Secure Electronic Delivery

Secure Electronic Delivery

Secure Electronic Delivery (SED) is a service created in 2003 and provided by the British Library Document Supply Service (BLDSS). Its purpose is to enable faster delivery of digital materials as encrypted, copyright-compliant PDF Documents, to a personal e-mail address. These documents are supplied from the British Library via its On Demand service. When the British Library supplies articles electronically, it sends them securely in order to ensure its usage is permitted (research purposes) and copyright law is observed. == Methods == As the publishing industry, authors and creators become highly protective of their assets and intellectual property, they impose strict rules on delivery methods to prevent copyright infringement. Nowadays, DRM-enabled secure delivery appears to be the most widely used solution to address issues faced by libraries in supplying ebooks and digital materials to their users. SED, one of these solutions, is using Adobe LiveCycle Digital Rights Management (LCDRM) as an encryption method to deliver documents. == Advantages == SED offers convenience, quality and speed as documents are delivered upon request at any location and on any device. Requested articles are scanned for high quality reproduction, opened anywhere on any machine, including mobile devices. == Restrictions == The following are restrictions hold in a SED service implementation: The digital material is accessible only for 14 days via a link sent to a personal message. Due to copyright reasons, the material can be opened only once, saved for 14 days and does not allow a copy-paste action. Upon display, the material must be printed from the same device and reprinted only once. The On Demand encryption technology works best on the default Safari browser although other browsers may accommodate it.

Articulatory speech recognition

Articulatory speech recognition means the recovery of speech (in forms of phonemes, syllables or words) from acoustic signals with the help of articulatory modeling or an extra input of articulatory movement data. Speech recognition (or automatic speech recognition, acoustic speech recognition) means the recovery of speech from acoustics (sound wave) only. Articulatory information is extremely helpful when the acoustic input is in low quality, perhaps because of noise or missing data. Measurable information from the articulatory system (e.g. tongue, jaw movements) can supplement acoustic signals to improve phone recognition accuracy by 2%. However, attempts to estimate articulatory data from acoustic signals alone have not significantly enhanced recognition performance.

Attribute–value system

An attribute–value system is a basic knowledge representation framework comprising a table with columns designating "attributes" (also known as "properties", "predicates", "features", "dimensions", "characteristics", "fields", "headers" or "independent variables" depending on the context) and "rows" designating "objects" (also known as "entities", "instances", "exemplars", "elements", "records" or "dependent variables"). Each table cell therefore designates the value (also known as "state") of a particular attribute of a particular object. == Example of attribute–value system == Below is a sample attribute–value system. It represents 10 objects (rows) and five features (columns). In this example, the table contains only integer values. In general, an attribute–value system may contain any kind of data, numeric or otherwise. An attribute–value system is distinguished from a simple "feature list" representation in that each feature in an attribute–value system may possess a range of values (e.g., feature P1 below, which has domain of {0,1,2}), rather than simply being present or absent (Barsalou & Hale 1993). == Other terms used for "attribute–value system" == Attribute–value systems are pervasive throughout many different literatures, and have been discussed under many different names: Flat data Spreadsheet Attribute–value system (Ziarko & Shan 1996) Information system (Pawlak 1981) Classification system (Ziarko 1998) Knowledge representation system (Wong & Ziarko 1986) Information table (Yao & Yao 2002)

REEM

REEM is a prototype humanoid robot built by PAL Robotics in Spain. It is a 1.70 m high humanoid robot with 22 degrees of freedom, with a mobile base with wheels, allowing it to move at 4 km/hour. The upper part of the robot consists of a torso with a touch screen, two motorized arms, which give it a high degree of expression, and a head, which is also motorized. REEM-A and REEM-B are the first and second prototypes of humanoid robots created by PAL Robotics. REEM-B can recognize, grasp and lift objects and walk by itself, avoiding obstacles through simultaneous localization and mapping. The robot accepts voice commands and can recognize faces. == Specifications ==

Colossus (supercomputer)

Colossus is a supercomputer developed by xAI. Construction began in 2024 in Memphis, Tennessee; the system became operational in July 2024. It is currently the world's largest AI supercomputer. Colossus's primary purpose is to train the company's chatbot, Grok. In addition, Colossus provides computing support to the social-media platform X and to other projects of Elon Musk, such as SpaceX. In 2025, it expanded to neighboring Southaven, Mississippi across the Tennessee–Mississippi border. As of May 6, 2026, Anthropic has agreed to rent all compute capacity at the Colossus 1 data center. == Background == Colossus was launched in September 2024 at a former Electrolux site in South Memphis to train the AI language model Grok. Within 19 days of the project's conception, xAI was ready to begin construction. The site was chosen because the abandoned Electrolux building could be repurposed to expedite construction and its proximity to a nearby wastewater treatment facility provided a water source. As of February 2025, xAI plans to build an $80 million facility to process additional wastewater for use at the supercomputer. === xAI === Musk incorporated xAI in March 2023 with the stated purpose of understanding the "nature of the universe". The team includes former members of OpenAI, DeepMind, Microsoft, and Tesla. Musk was one of the founding members of the company OpenAI, investing up to US$45 million in 2015. He left OpenAI in 2018, reportedly to avoid conflicts of interest with Tesla. It has also been reported that he had made a bid for leadership at OpenAI and left when his proposal was rejected. The exact reasons for his departure from the company are unclear. Both Dell Technologies and Supermicro partnered with xAI to build the supercomputer. It was originally powered by 100,000 Nvidia graphics processing units (GPUs) and was constructed in 122 days. 3 months after the first 100,000 GPUs were deployed, xAI announced that they had increased the system to 200,000 GPUs and that they intended to continue increasing the computer's processing power to 1 million GPUs. As of April 2025, xAI claimed Colossus was the largest AI training platform in the world. == Choice of location == xAI selected Memphis, in southwestern Tennessee, as the site for Colossus in part because an existing industrial facility allowed the project to proceed more quickly than constructing a new data center. Elon Musk was initially told that building a data center would take 18–24 months. The company instead searched for a vacant facility and selected the former Electrolux factory in Memphis. Electrolux opened the facility in 2012 and operated it for about eight years before closing it in 2020 after relocating operations to Springfield, Tennessee. The building covered 785,000 sq ft (72,900 m2) and had been purchased by Phoenix Investors in December 2023 for $35 million . Because the structure was already in place, work on the supercomputer could begin immediately rather than waiting for a new facility to be constructed. According to Forbes, xAI considered seven or eight other sites before selecting Memphis, and Musk finalized the decision to build in Memphis in about a week. The decision was finalized in March 2024, after which construction began. xAI publicly announced in June 2024 that Colossus would be built in Memphis. The building itself was not the only reason xAI selected Memphis. According to the Greater Memphis Chamber, the company chose the city because of its "reliable power grid, ability to create a water recycling facility, proximity to the Mississippi River and ample land". The city was also able to provide the large amounts of electricity and water needed to operate the supercomputer. At full capacity, the system was expected to require 150 megawatts of electricity and millions of gallons of water per day. The project also relied on partnerships with local and regional organizations including Memphis Light, Gas and Water (MLGW), Tennessee Valley Authority (TVA), the City of Memphis, and Shelby County. The city also provided financial incentives for the project. == Environmental impact == AI data centers consume large amounts of energy. At the site of Colossus in South Memphis, the grid connection was only 8 MW, so xAI applied to temporarily set up more than a dozen gas turbines (Voltagrid’s 2.5 MW units and Solar Turbines’ 16 MW SMT-130s) which would steadily burn methane gas from a 16-inch natural gas main. Aerial imagery in April 2025 showed 35 gas turbines had been set up at a combined 422 MW. These turbines have been estimated to generate about "72 megawatts, which is approximately 3% of the (TVA) power grid". The higher number of gas turbines and the subsequent emissions requires xAI to have a major source permit. In Memphis, xAI was able to avoid some environmental rules in the construction of Colossus, such as operating without permits for the on-site methane gas turbines because they are "portable". The Shelby County Health Department told NPR that "it only regulates gas-burning generators if they're in the same location for more than 364 days". However, in a January 2026 ruling, the EPA revised its New Source Performance Standard and announced that large methane gas turbines require permits even for temporary operations. In November 2024, the grid connection was upgraded to 150 MW, and some turbines were removed. Along with high electricity needs, the expected water demand is over five million gallons of water per day. While xAI has stated they plan to work with MLGW on a wastewater treatment facility and the installation of 50 megawatts of large battery storage facilities, there are currently no concrete plans in place aside from a one-page factsheet shared by MLGW. == Community response == The plan to build Colossus in Memphis was unknown to residents, City Council members, and environmental agencies. Many did not find out about the project until the day before, or the day of, as they watched the announcement on the local news. Keshaun Pearson, president of Memphis Community Against Pollution, stated that there is a historical lack of transparency and communication surrounding environmental issues in Memphis. Some community members in Memphis have expressed concern about the potential for additional air and water pollution caused by the supercomputer. In a letter to the Shelby County Health Department, the Southern Environmental Law Center stated the emissions from the turbines make the facility "...likely the largest industrial emitter of NOx in Memphis..." This is due to data supplied by the manufacturer showing that "...xAI emits between 1,200 and 2,000 tons of smog-forming nitrogen oxides (NOx)..." At a public Shelby County Commissioner's hearing on April 9, 2025, residents living near the site of Colossus voiced complaints about air quality, noting that they have chronic respiratory issues related to living in a polluted section of Memphis. One woman said she smells "everything but the right thing and the right thing is the clean air." Other residents voiced frustration that Brent Mayo, the senior xAI official responsible for building out xAI's infrastructure, did not attend the meeting to discuss community concerns. Keshaun Pearson also stated that "We're getting more and more days a year where it is unhealthy for us to go outside." People living near the site of Colossus have said they were not offered the opportunity for a public review of the plans, nor were they provided with information on how their community could potentially benefit. The community is also concerned about the strain on the power grid. Memphis's peak demand is around 3 GW. In November 2024, TVA approved xAI's request for access to more than 100 megawatts of power to Colossus which is supplied by MLGW. In December 2022, MLGW imposed (then rescinded) rolling blackouts during several days of extreme cold, straining the power grid. In a letter to the TVA, the SELC "urged the agency to 'prioritize Memphis families' access to reliable power over the 'secondary purpose' of serving xAI". == Current progress == In early December 2024, Ted Townsend detailed how the power of Colossus doubled in its processing capability. When it first went online in September 2024, it was using "100,000 Nvidia H100 processing chips". This initial launch demonstrated Colossus to be the largest supercomputer globally. The maximum power consumption increased from 150 to 250 MW. As of June 2025, the supercomputer consists of 150,000 H100 GPUs, 50,000 H200 GPUs, and 30,000 GB200 GPUs. Another 110,000 GB200 GPUs are to be brought online at a second data center, also in the Memphis area. The expansion of this supercomputer has already been discussed and will be the second phase of the project. xAI also plans to increase Colossus to 1 million GPUs. Because the supercomputer currently utilizes gas turbines for power, alongside 168 Tesla Megapack battery storage units. xAI is also looking to add more

Time-inhomogeneous hidden Bernoulli model

Time-inhomogeneous hidden Bernoulli model (TI-HBM) is an alternative to hidden Markov model (HMM) for automatic speech recognition. Contrary to HMM, the state transition process in TI-HBM is not a Markov-dependent process, rather it is a generalized Bernoulli (an independent) process. This difference leads to elimination of dynamic programming at state-level in TI-HBM decoding process. Thus, the computational complexity of TI-HBM for probability evaluation and state estimation is O ( N L ) {\displaystyle O(NL)} (instead of O ( N 2 L ) {\displaystyle O(N^{2}L)} in the HMM case, where N {\displaystyle N} and L {\displaystyle L} are number of states and observation sequence length respectively). The TI-HBM is able to model acoustic-unit duration (e.g. phone/word duration) by using a built-in parameter named survival probability. The TI-HBM is simpler and faster than HMM in a phoneme recognition task, but its performance is comparable to HMM. For details, see [1] or [2].

Chainer

Chainer is an open source deep learning framework written purely in Python on top of NumPy and CuPy Python libraries. The development is led by Japanese venture company Preferred Networks in partnership with IBM, Intel, Microsoft, and Nvidia. Chainer is notable for its early adoption of "define-by-run" scheme, as well as its performance on large scale systems. The first version was released in June 2015 and has gained large popularity in Japan since then. Furthermore, in 2017, it was listed by KDnuggets in top 10 open source machine learning Python projects. In December 2019, Preferred Networks announced the transition of its development effort from Chainer to PyTorch and it will only provide maintenance patches after releasing v7. == Define-by-run == Chainer was the first deep learning framework to introduce the define-by-run approach. The traditional procedure to train a network was in two phases: define the fixed connections between mathematical operations (such as matrix multiplication and nonlinear activations) in the network, and then run the actual training calculation. This is called the define-and-run or static-graph approach. Theano and TensorFlow are among the notable frameworks that took this approach. In contrast, in the define-by-run or dynamic-graph approach, the connection in a network is not determined when the training is started. The network is determined during the training as the actual calculation is performed. One of the advantages of this approach is that it is intuitive and flexible. If the network has complicated control flows such as conditionals and loops, in the define-and-run approach, specially designed operations for such constructs are needed. On the other hand, in the define-by-run approach, programming language's native constructs such as if statements and for loops can be used to describe such flow. This flexibility is especially useful to implement recurrent neural networks. Another advantage is ease of debugging. In the define-and-run approach, if an error (such as numeric error) has occurred in the training calculation, it is often difficult to inspect the fault, because the code written to define the network and the actual place of the error are separated. In the define-by-run approach, you can just suspend the calculation with the language's built-in debugger and inspect the data that flows on your code of the network. Define-by-run has gained popularity since the introduction by Chainer and is now implemented in many other frameworks, including PyTorch and TensorFlow. == Extension libraries == Chainer has four extension libraries, ChainerMN, ChainerRL, ChainerCV and ChainerUI. ChainerMN enables Chainer to be used on multiple GPUs with performance significantly faster than other deep learning frameworks. A supercomputer running Chainer on 1024 GPUs processed 90 epochs of ImageNet dataset on ResNet-50 network in 15 minutes, which is four times faster than the previous record held by Facebook. ChainerRL adds state of art deep reinforcement learning algorithms, and ChainerUI is a management and visualization tool. == Applications == Chainer is used as the framework for PaintsChainer, a service which does automatic colorization of black and white, line only, draft drawings with minimal user input.